| Falmer Signalbox between Brighton and Lewes. Although no longer in use as a signalbox, it
has not been dismantled and is, in fact, kept in a very smart condition. Seen here on 15th September 2004.
photograph by Peter Richards |
![]() |
![]() |
Here is the SR Standard 3-Position Block
Instrument from here to Lewes, the block bell and some of the repeaters from when the box was still in
use.
photograph by kind permission of Alan Elliott |
| The frame at Falmer. This was referred to as a "knee
frame" which is, in reality, a ground frame used inside a Signalbox. This
was installed by the Southern Railway in September 1929 when this platform
box replaced the earlier LB&SCR one.
photographs by kind permission of Alan Elliott |
![]() |
![]() |
Another view of the frame at Falmer. Lever 1, the up distant, has 2, 3 and
4 painted on it. This indicates that before the distant signal can be pulled
off each of signals 2, 3 and 4 have to be already off. These plates were all
painted for the SR BR(S) by one man, and when he retired they they stopped
using painted plates!
photograph by kind permission of Alan Elliott |
All photographs are copyright
This page was last updated 22 May 2007
Return to Southern Signalboxes index